Basra Oil Company
Majnoon Oil Field
Gulf Water Treatment CO. LTD.
China Petroleum Engineering & Construction Corporation (CPECC), Iraq Branch
KBR
| Project Title | EPCC FOR AMINE UNIT TRAIN-1 FOR SOUR GAS TREATMENT FACILITY (SGTF) MAJNOON OIL FIELD |
| EPC Contract No. | BOC-1933 |
| CPECC Project Code | IQ04668 |
| Purchase Order No. | IQP-4068-MS-002 |
| Purchase Order Description | DEMINERALIZED WATER PACKAGE |
| Vendor | GULF WATER TREATMENT CO. LTD |
Micron Cartridge Filters: Dual-stage filtration (5μm and 1μm) ensures effective removal of particulates to protect RO membranes and improve efficiency.
Chemical Dosing Systems:
Membranes: Hydranautics/FilmTec polyamide composite membranes deliver 99.7% salt rejection.
Two-Stage RO Configuration: Optimized recovery ratio of 60%, significantly reducing water wastage.
Pressure Vessels: FRP construction designed to handle high-pressure operations, ensuring durability.
Advanced EDI Technology: Continuous polishing of RO permeate to achieve conductivity below 0.2 µS/cm without chemical regeneration.
Capacity: Delivers 1 CMH of ultrapure water, suitable for critical industrial applications.
SS316L for high-pressure and permeate water lines, CPVC for chemical dosing lines, UPVC for low-pressure reject lines
Pre-Assembled: Fully integrated system within two 40-ft high-cube containers for ease of transportation and rapid on-site deployment.
Internal Environment: Marine-grade epoxy coating, GRP waterproof flooring, and split air-conditioning units ensure operational reliability in harsh environments.
EXD: 21.7 kW Connected, 15.4 kW Operational
Detailed schematic of the treatment process
Layout and spatial organization of components
Interactive 3D representation of the plant